PROJECT AMOUNT: $4,000,000

DESCRIPTION

Installation of new 13.2KV Armored Cables Parallel circuits trough cable tray (2,000LF approx). Installation of 1ea. Master Electrical Room with 4ea. Double Ended 20,000KW 13.2KV/480V Metal-Clad Electrical Substation; 1ea. 13.2KV Switching Units Banks; 2ea. 13.2KV Capacitor Banks; 1ea. 13.2KV Metal-Clad Switchgear.

Installation of 5ea. Secondary Electrical rooms with Double Ended 20,000KW 13.2KV/480V Substations on each room; 8ea. 800amps. MCC’s; 20ea. 1,200amps MDP’s with all loads

Installation of 1ea. 2,500KW Emergency Generator

TARGET

New power source for HUMIRA Bulk Building.

CONSTRUCTION TIME

The project was perform in 2 years.


PROJECT AMOUNT: $1,500,000

DESCRIPTION

Installation of 3,000 line feet of cable tray around the plant. Run 100,000 lf of 5kv 500 mcm cable and 2,000 line feet of 4” rigid conduit. Also installation of cable termination such as 5kv stresscone.

TARGET

Re-distribution of critical load feeder because of building demolition.

CONSTRUCTION TIME

The project was perform in 6 month.